BuyWhatFits

What EV Charger Do You Need for a 2024 Nissan Leaf SV?

What to buy
A 32 A charger on a 40 A circuit
Your 2024 Nissan Leaf SV accepts at most 6.6 kW (28 A) of AC power. A larger charger will not charge it faster.

A full charge takes 9.9 hours at maximum Level 2 speed, which easily refills the battery overnight. You need a 32 amp EVSE paired with a 40 amp breaker to hit that peak. Plugging into a standard household wall outlet takes 45 hours.

Matches your car
Grizzl-E Grizzl-E Classic 40A
40 A · J1772 · plug-in
See it on Amazon

The numbers

Maximum AC charging rate6.6 kW (28 A)
Charger size to buy32 A
Circuit breaker required40 A
Outlet / connectionNEMA 14-50 outlet on a 40 A breaker, or hardwired
Charge portJ1772
Full charge on Level 2about 9.9 hours
Range added per hour (Level 2)about 21 miles
Full charge on a 120 V outletabout 45 hours
Range added per hour (120 V)about 4.7 miles
EPA rated range212 miles
Energy for a full chargeabout 65.3 kWh at the wall

Why 32 amps and not more

Your car accepts 28 amps maximum on AC power. Buying a 32 amp or 40 amp charger provides the exact current the onboard charger handles without wasting money on unused capacity. Even if you connect a 40 amp or 50 amp supply, the car limits draw to 28 amps. Wiring for 32 amps gives you head room on the circuit. Faster hardware will not speed up your charge times.

What the install involves

Install a NEMA 14-50 outlet on a 40 amp breaker, or hardwire the unit directly to the electrical panel. Heavy-duty copper wiring sized for 40 amps stops the circuit from overheating during long sessions. Never use old residential receptacles or standard household extension cords for Level 2 loads. Hire a licensed electrician to verify load calculations and run the new line.

Chargers that match this car

Grizzl-E Classic 40A
40 A · J1772 · plug-in · 24.0 ft cable
Rugged metal enclosure, built for outdoor use.
See the Grizzl-E Grizzl-E Classic 40A
Grizzl-E Mini Portable
40 A · J1772 · plug-in · 25.0 ft cable
Portable cordset. Works on 120 V or a 240 V outlet.
See the Grizzl-E Grizzl-E Mini Portable
Home Flex NEMA 14-50
40 A · J1772 · plug-in · 23.0 ft cable
Plugs into an existing 14-50 outlet, no hardwiring.
See the ChargePoint Home Flex NEMA 14-50

Worth having as well

Tesla to J1772 Charging Adapter 80A
Lets a J1772 car use Tesla Destination Chargers and Wall Connectors.
See the Lectron Tesla to J1772 Charging Adapter 80A
J1772 Extension Cable 20ft 40A
For when the charger cable will not reach your car's port.
See the EVCONN J1772 Extension Cable 20ft 40A
As an Amazon Associate we earn from qualifying purchases. Prices and availability are not shown here because they change constantly, so check the current price on Amazon.

Common questions

Can I use a Level 1 household outlet?
Yes, but expect 45 hours for a complete fill. That works only if you drive very few miles daily.
What plug does this car require?
The car uses a J1772 connector for standard Level 2 charging. Every non-Tesla EV sold in North America through 2024 uses this plug format.
Why does the EPA charge time differ?
The EPA tests show 11.0 hours because standard test cycles account for grid efficiency losses and voltage variations. Real-world conditions often track closer to the raw 9.9 hour calculation.
How many miles of range do I get per hour?
Level 2 charging adds 21 miles of range for every hour plugged in. Level 1 crawling adds 4.7 miles per hour.

Other vehicles

2026 Nissan Leaf2025 Nissan Leaf2025 Nissan Leaf SV2024 Nissan Leaf2023 Nissan Leaf2023 Nissan Leaf SV

Charging times derived from EPA data for the 2024 Nissan Leaf SV. Electrical requirements follow NEC 625.41, which sizes a circuit at 125% of a continuous load. Always have a licensed electrician verify your panel.