What EV Charger Do You Need for a 2026 Dodge Charger Daytona Scat Pack?
Your home supply can push plenty of power, but the car dictates what goes into the battery. This Dodge draws up to 11.0 kW on alternating current. You need a 48 amp Level 2 setup to hit that ceiling. Let us look at what hardware makes that happen.
The numbers
| Maximum AC charging rate | 11.0 kW (48 A) |
|---|---|
| Charger size to buy | 48 A |
| Circuit breaker required | 60 A |
| Outlet / connection | hardwired (a 48 A EVSE must be hardwired -- no household receptacle is rated for it) |
| Charge port | J1772 |
| Full charge on Level 2 | about 9.5 hours |
| Range added per hour (Level 2) | about 28 miles |
| Full charge on a 120 V outlet | about 73 hours |
| Range added per hour (120 V) | about 3.7 miles |
| EPA rated range | 267 miles |
| Energy for a full charge | about 104.5 kWh at the wall |
Why 48 amps and not more
The onboard charger maxes out at 48 amps. Buying a larger unit gets you zero extra speed. The car ignores current above its limit. A 48 amp Level 2 supply refills the 104.5 kWh battery in 9.5 hours. That puts 28 miles of range into the pack every single hour. Anything smaller leaves speed on the table.
What the install involves
Do not plug a 48 amp load into a wall outlet. No household receptacle handles that draw safely, meaning hardwiring is mandatory. You need a professional electrician to pull six gauge wire and land it on a 60 amp breaker. Ask them to verify your main panel has spare capacity before starting. Hardwiring cuts out thermal failure points entirely.
Chargers that match this car
Energy monitoring built in. Hardwire it for the full 48 A.
Compact unit, good for tight garages.
Adjustable from 16 A to 50 A in the app, which helps if your panel is tight.
Worth having as well
Common questions
- How long does a full charge take?
- A Level 2 charger running at maximum speed takes 9.5 hours to refill the pack. The EPA test estimates 10.0 hours because their testing cycle runs under slightly different conditions. Standard wall charging takes 73 hours.
- Can I use a regular wall outlet?
- No. Level 1 charging on a standard 120 volt outlet only adds 3.7 miles of range per hour. You need a dedicated 240 volt circuit for real speed.
- What plug type does the car use?
- The car uses a J1772 connector. This model year sits in the industry transition period, so confirm your physical port before ordering hardware.
- Do I need an adapter for Tesla destination chargers?
- Yes, if you want to use Tesla hardware with your J1772 port. An adapter lets you plug into those stations easily.
Other vehicles
Charging times derived from EPA data for the 2026 Dodge Charger Daytona Scat Pack. Electrical requirements follow NEC 625.41, which sizes a circuit at 125% of a continuous load. Always have a licensed electrician verify your panel.