What home charger does the Polestar 2 need?

What to buy, 2021-2025
A 48 A charger on a 60 A circuit
Every Polestar 2 from 2021 to 2025 accepts at most 11.0 kW (48 A) of AC power, whatever the trim. A bigger charger will not charge it any faster.
Model yearsTrimsCar acceptsChargerBreaker
2021-2025all trims11.0 kW / 48 A48 A60 A

The Polestar 2 takes a 48 A charger on a 60 A breaker. Every model year from 2021 through 2025, single or dual motor, accepts 11.0 kW on AC.

Fits every Polestar 2
Emporia Level 2 EV Charger 48A
48 A · J1772 · plug-in or hardwired
Check price on Amazon

Why 48 amps and not more

The car caps AC charging at 11.0 kW, so a charger above 48 A is wasted. A 40 A charger costs some speed, bringing a 2025 from 30 to 37 miles of range per hour down to 25 to 31. For most commutes that slower rate still refills the day's driving overnight.

Charging time by model year

YearEPA rangeLevel 2, miles per hourLevel 2, empty to full120 V, miles per hour
2025254 to 314 mi30 to 378.5 h3.9 to 4.9
2024247 to 320 mi31 to 387.9 to 8.5 h4.1 to 4.9
2023247 to 270 mi31 to 357.7 to 8 h4 to 4.6
2022249 to 270 mi357.7 h4.6
2021233 mi307.8 h3.9

Level 2 figures assume a charger that supplies the car's full rate. Where a year shows a range, it spans that year's trims.

The Polestar 2 got more range over the years, from 233 miles in 2021 to as much as 320 in 2024, while the charger stayed the same. Full charges take 7.7 to 8.5 hours from empty, so a used early car and a new one need the same equipment.

What the install involves

Expect a permit and an inspection for a new 240 V circuit. The electrician will fit a 60 A breaker and hardwire the charger, because no household receptacle is rated for a 48 A load. If the panel is short on room, a 40 A charger on a NEMA 14-50 outlet and a 50 A breaker is the usual fallback.

Chargers that fit the Polestar 2

Smallest adequate unit first. Every amp above what the car accepts is capacity it never uses.

Emporia Level 2 EV Charger 48A
48 A · J1772 · plug-in or hardwired · 24 ft cable
Energy monitoring built in. Hardwire it for the full 48 A.
See the Emporia Level 2 EV Charger 48A
Wallbox Pulsar Plus 48A
48 A · J1772 · hardwired · 25 ft cable
Compact unit, good for tight garages.
See the Wallbox Pulsar Plus 48A
ChargePoint Home Flex 50A Hardwired
50 A · J1772 · hardwired · 23 ft cable
Adjustable from 16 A to 50 A in the app, which helps if your panel is tight.
See the ChargePoint Home Flex 50A Hardwired

Worth having as well

Lectron Tesla to J1772 Charging Adapter 80A
Lets a J1772 car use Tesla Destination Chargers and Wall Connectors.
See the Lectron Tesla to J1772 Charging Adapter 80A
EVCONN J1772 Extension Cable 20ft 40A
For when the charger cable will not reach your car's port.
See the EVCONN J1772 Extension Cable 20ft 40A
As an Amazon Associate we earn from qualifying purchases. Prices change constantly, so none are shown here. Check the current price on Amazon.

Common questions

Does a used 2021 Polestar 2 need a different charger from a 2025?
No. Every year accepts 11.0 kW, so the same 48 A charger fits.
How long does a Polestar 2 take to charge from empty?
About 7.7 to 8.5 hours on a 48 A charger.
Can a Polestar 2 use a NEMA 14-50 outlet?
Yes, through a 40 A charger on a 50 A breaker. A 48 A charger must be hardwired.
What charge port does the Polestar 2 use?
The 2021 to 2024 cars use J1772. For 2025, check your own car, since makers are moving to NACS at different times.

Other models

Polestar 3 2025-2026Polestar 4 2025-2026Acura ZDX 2024-2026Audi A6 e-tron 2027Audi e-tron GT 2022-2027Audi Q4 e-tron 2022-2026Audi Q6 e-tron 2025-2027Audi Q8 e-tron and e-tron 2019-2025

Range and efficiency come from EPA data for the Polestar 2, covering 9 EPA listings across 5 model years. Onboard charger ratings are from manufacturer specifications. Breakers follow NEC 625.41, which sizes a continuous load at 125%. Have a licensed electrician check your panel before buying.